Tk'emlúps te Secwépemc - East Shuswap Road: Watermain and Reservoir
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Tk'emlúps te Secwépemc (TteS) requires a new 2,630 m3 reservoir in the East Shuswap pressure zone to replace the existing, aging and undersized 350 m3 East Shuswap Reservoir. This project is necessary to (1) maintain current levels of water services for future development along East Shuswap Rd, and (2) to upgrade the system to be able to achieve minimum fire flow targets to all lots in the area. This includes at the Tk'emlúps Healing House, which is expected to be completed in Fall 2026. The existing infrastructure is not able to meet fire flow targets in the majority of the pressure zone, and this must be rectified before the Healing House is officially opened.
The site infrastructure upgrades include installation of a 2,630 m3 concrete reservoir (divided into two 1,315 m3 cells), 420 m of new 350 mm watermain, and related site drainage, electrical, and instrumentation upgrades.
An archaeological overview has been completed by Tk'emlúps' Archaeology Department, and an Environmental Assessment Scoping Report was completed to determine potential environmental impacts and mitigation measures.
Latest update
NOTICE OF INTENT TO MAKE A DETERMINATION
Tk’emlúps te Secwépemc – East Shuswap Road, Watermain and Reservoir – Public Comments Invited
May 07, 2026 – Indigenous Services Canada must determine whether the proposed East Shuswap Road, Watermain and Reservoir, located in Tk’emlúps te Secwépemc is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.
Written comments must be submitted by June 08, 2025 to the BC Environment Team
.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | NOTICE OF INTENT TO MAKE A DETERMINATION Tk'emlúps te Secwépemc – East Shuswap Road, Watermain and Reservoir – Public Comments Invited | PDF (42 KB) | May 7, 2026 |
Contacts
BC Environment TeamIndigenous Services Canada
600-1138 Melville Street
Vancouver, British Columbia V6E 4S3
Email: bcciarpubliccomments@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Harper Ranch Pinantan Road (British Columbia)
-
Nature of Activity
- Water Management
-
Assessment Status
In progress -
Start Date
2026-05-07 -
Proponent
Tk'emlúps te Secwépemc -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90477
Nearby assessments
...within 200 kilometres-
TteS Road Realignment and Roundabout Project
Kamloops Indian Reserve No. 1 -
Tk'emlúps te Secwepemc CLC Stormwater Detention Facility
Kamloops 1 -
New Fibre Installation
TteS West Tkemlups -
Tk'emlups Commercial Complex Lot 164
Tk'emlúps te Secwépemc 07173 - KAMLOOPS 1 -
Construction of a building on Kamloops Indian Reserve No. 1, City of Kamloops
Kamloops Indian Reserve No.1, city of Kamloops -
Ajax Mine Project
Kamloops -
Tk?emlúps te Secwépemc - Mount Paul Multi-family Residential Development
Kamloops IR1, BC -
Tk'emlúps te Secwépemc Stswékstem Engineered Waste Management Facility
Tk'emlúps te Secwépemc, Kamloops #1 -
Construction of a new building in Kamloops, British Columbia
324 Mt. Paul Way, Kamloops, British Columbia -
T'kemlúps te Secwépemc - Kamloops IR1, Lot 8-1 and 9, Commercial Lease
Kamloops -
North Thompson Rail Terminal Development Project
Kamloops -
New Fibre Installation
Project Site 02: Whispering Pines 4 -
Westsyde Road Multi-Use Pathway
Whispering Pines 4 -
Whispering Pines IR#4 Watermain Extension
Whispering Pines IR#4 -
Westsyde Road Multi-Use Pathway: Phase 2
Westsyde Road Multi-Use Pathway: Phase 2 -
New Fibre Installation
Project Site 1: NISKONLITH 1 -
Whispering Pines/Clinton Indian Band Living Revetment Site 2B
Whispering Pines/Clinton Indian Band Living Revetment Site 2B -
Shoreline Revetment on Whispering Pines/Clinton Indian Band Reserve Lands
Whispering Pines/Clinton Indian Band Reserve #4 -
New Fibre Installation
Project Site 10: Kamloops 4 -
Adams Lake-Sahhltkum IR#4 Water Treatment and Reservoir
07155 - SAHHALTKUM 4 -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
CHUM CREEK 2 07179 -
Harvesting of damaged timber by the 2023 forest fire on Quaaout 1
Quaaout 1 -
New Fibre Installation
Project Site 3: MEADOW CREEK 3 -
Forest Fuel Management Quaaout #1
Quaaout #1 -
Timber harvesting on Hustalen IR #1 Adams Lake
Hustalen #1 -
New Fibre Installation
Project Site 06: Louis Creek 4 -
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen.
TELUS Communications Inc.'s New Antenna Proposal for Existing Tower on Mount Wallensteen -
Skeetchestn Pipeline Segment Replacement and Valve Site Installation
Site Location -
Skeetchestn Learning Garden Centre
Skeetchestn Indian Band -
Upper Nicola Band - Quilchena Community Centre
Upper Nicola Band - Quilchena Community Centre -
Upper Nicola Band - Nicola River Road and Michel Road Drainage Upgrades
Upper Nicola -
Upper Nicola Band/Okanagan Nation Alliance Solar Farm Project
NICOLA LAKE 1 -
New Telus Communications Inc. Telecommunication Tower Project on Skeetchestn Reserve.
Telecommunication Tower Project on Skeetchestn Reserve -
Timber harvesting on CHUM CREEK 2 07179 & SCOTCH CREEK 4 07181
SCOTCH CREEK 4 07181 -
Douglas Lake Ranch Transmission 3 - Phase Line Relocation
Douglas Lake IR 3 -
BC Ministry of Transportation and Infrastructure Highway 1 Four-Laning
North Bay IR 5 -
New Fibre Installation
Project Site 6: SWITSEMALPH -
Simpcw: Chinook Cove Water System Upgrades and Extension
Simpcw First Nation North Thompson IR1 -
Okanagan Indian Band 1 - Fortis BC Natural gas pipeline replacement project
Okanagan Indian Band, Salmon River -
Affordable Housing Units
Adams Lake Indian Band -
New Fibre Installation
Project Site 4: SALMON RIVER 1 -
New Fibre Installation
Project Site 2: OKANAGAN 1 -
OKIB Round Lake/Madeline Lake/Heart Lake/Salmon River Water System Improvements
Head of the Lake, Vernon BC -
Timber harvesting on Salmon River 1
Salmon River 1 -
Dunn Lake Road Widening and Realignment Project
Simpcw First Nation -
New Fibre Installation
Project Site 08: North Thompson 1 -
New Fibre Installation
Okanagan -
Timber harvesting on North Thompson 1
North Thompson IR #1 -
New Fibre Installation
Project site 2: Salmon River -
Simpcw Community Centre - NEQWEYQWELSTEN SCHOOL
Simpcw First Nation, North Thompson 1 -
OKIB IR1 Lot 27 & 28 - Gas Station and Convenience Store
OKIB IR1 Lot 27 & 28 -
New School - Okanagan IR#1 Elementary School
Okanagan Indian Band -
Okanagan Indian Band Gravel Pit Reactivation
Okanagan IR No. 1 -
Irish Creek/Head of the Lake Water System Upgrades
Okanagan Indian Band IR1 -
Head of the Lake Subdivision
Vernon -
Splatsin Shihiya K4-G7 Elementary School
Splatsin Enderby IR #2 -
Lower Nicola Indian Band Community Solar Gardens
Lower Nicola Reserve Lands - Nicola Mameet No. 1, Joeyaska No. 2, and Zoht No. 4 -
New Fibre Installation
Project site 1: Enderby 2 -
Shuswap North Okanagan Rail Trail
Splatsin First Nation -
Timixw Mixed Use Development
Vernon, BC -
Ashcroft Indian Band - Community Centre
Ashcroft Indian Band - Community Centre -
New Fibre Installation
Project Site 5: ENDERBY 2 -
Shackan - Sand and Gravel operation on Shackan IR11
Shackan 11 -
TELUS Cell Tower Cable Upgrade
1100 Mission Rd, Vernon -
Automated Weather Station at 250 Allan Brooks Way, Vernon, BC
250 Allan Brooks Way, Vernon -
Construct Buildings and Washrack at Vernon Military Camp
Vernon Military Camp, 3100 15th Ave, Vernon -
Main Camp Utilities Upgrade at Vernon Military Camp
Vernon Military Camp -
Norah's Pond Expansion
Allan Brooks Nature Centre, Vernon, BC -
Fence and Obstacle Course - Vernon Military Camp
Vernon Military Camp -
Vernon Rifle Range Geotechnical Investigation
Vernon Rifle Range -
Pump Station Demolition - 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
Detachment British Columbia Mainland - Chilliwack -
Pump Station Demolition- 3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack
3rd Canadian Division Support Group (CDSG), Detachment British Columbia Mainland - Chilliwack -
New Fibre Installation
Nooaitch -
Cook's Ferry Indian Band, BC
Cook's Ferry Indian Band, BC -
New Fibre Installation
Coldwater -
Sackum Creek Overhead Bridge Replacement
Sackum IR No. 3 and Gulada IR No. 3A -
Okanagan Indian Band Business Park Phase 1
Lots 1, 1-2, 1-3, and 14, Duck Lake IR7 -
OKIB Business Park, Phase 2
OKIB Business Park, Phase 2 -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Nzen'man' Bird's Nest Project
Nzen'man' Bird's Nest Project -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Kingsvale -
Runway End Safety Area - Kelowna International Airport
Kelowna International Airport -
Combined Operations Building - Kelowna International Airport
Kelowna International Airport -
Harper Creek Mine Project
Vavenby -
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project
Lytton First Nation - Nuuautin IR2B Subdivision & Stein Water System Improvement Project -
Lytton First Nation - Battlefield Housing and Food Hub
Lytton First Nation, Lytton, BC -
Lytton First Nation - Stein Water System Intake Improvements Project
Lytton First Nation - Stein Water System Intake Improvements Project -
Skuppah Indian Band - Food Security Centre
Inklyuhkinatko no 2 reserve -
Skuppah Indian Band - Food Security and Cultural Garden
Inklyuhkinatko Reserve No. 2 -
New Fibre Installation - TELUS
Project Site 01: Lillooet Corridor -
Xaxli'p First Nation Green Hydrogen Production Facility
Xaxli'p Fountain IR1B, Lillooet, BC -
McCartney's Flat IR#4 Water System Improvements
T'IT'Q'ET McCartney's Flat IR#4 -
Cayoose Creek Water System Connection to Village of Lillooet
Cayoose Creek IR 1 -
DWS Cayoose Creek IR #1 interconnection with DOL
Seton River near Lillooet -
Speyum Creek Watercourse Restoration
Speyum Creek -
Summerland Chemical Storage Building Project
Summerland -
Summerland Irrigation Infrastructure Rehabilitation
Summerland -
Agriculture and Agri-Food Canada Building Demolition at Summerland
Summerland -
Field Covering System and Cherry Orchard
Summerland Research and Development Centre -
Penticton IR1 - Bell Media Tower Replacement Project
Penticton IR 1 - Mount Nkwala -
Princeton Detachment Replacement
Princeton -
Penticton Indian Band Sage Road 24 Lot Subdivision
Penticton Indian Band 24 Lot Sage Road Subdivision Development -
Outma Sqilx'W School Addition
Penticton Indian Band IR. No. 1 -
Terminated - Penticton Airport - North Apron Expansion
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 28 - Construction of 11 private hangars
Penticton -
Project Removed by Federal Authority - Penticton Airport - Lot 43 - Canadian Helicopters Ltd - Lease Expansion to Construct New Aircraft Storage Hangar
Penticton -
Spuzzum First Nation Drinking Water Access Road
Spuzzum Access Road -
Terminated - Penticton Airport Parking Lot Rehabilitation and Expansion
Penticton Airport -
Parking Lot repave
301 3rd Street West, Revelstoke -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Ruddock Creek Mine Project
Avola -
New Fibre Installation
Canoe Creek IR#2 -
Pole Removal at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory, British Columbia -
FortisBC Pipeline Integrity Dig at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Vaseux Floodplain re-engagement at Vaseux-Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
Yale First Nation Recreation Centre
Stulkawhits No. 8 Reserve Land -
N'Quatqua-Wastewater and Sludge Management
07991 - NEQUATQUE 1-75805CLSRBC / 75667CLSRBC -
Boardwalk Replacement Project - Vaseux Bighorn National Wildlife Area
Vaseux-Bighorn National Wildlife Area -
N'Quatqua Multi-Use Facility Project
N'Quatqua Multi-Use Facility Project -
N'Quatqua Watermain Extension and Phase 1 Subdivision
N'Quatqua IR#1 -
Revision to the Posting for IAA Reference Number 85749 (Canoe Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Canoe Creek/Meadow Lake
Stswecem'c Xget'tem First Nation -
New Telus Communications Inc. Telecommunication Tower Project in Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands
Canoe Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Upper Similkameen Indian Band - Water System Upgrades
Chuchuwayha I.R. No. 2 -
Timber harvesting on CLUDOLICUM 9
CLUDOLICUM 9 -
Underground Conduit Upgrade at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Canadian Hydrogen Observatory and Radio-transient Detector (Dominion Radio Astrophysical Observatory)
Dominion Radio Astrophysical Observatory -
Well and Septic Installation Project at NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Fuel tank removal at the NRC Dominion Radio Astrophysical Observatory
Dominion Radio Astrophysical Observatory -
Chawathil - Schkam IR#2 Sewer System Improvements
Chawathil, Schkam IR#2 -
Marine yard development
Marine yard development -
New Telus Communications Inc. Telecommunication Tower Project in Dog Creek 1 Reserve on Stswecem'c Xget'tem Nation Lands
Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands -
Revision to the Posting for IAA Reference Number 85748 (Dog Creek). Telus Communications Inc. is Proposing a Revision to their Original Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands.
Telecommunication Tower Project in Dog Creek I.R. No. 1 on Stswecem'c Xget'tem Nation Lands. -
Stswecem'c Xget'tem First Nation - Telus Telecommunications Tower - Dog Creek
Stswecem'c Xgat'tem First Nation -
Kingsvale-Oliver Natural Gas Pipeline Reinforcement Project
Oliver -
Douglas First Nation - Douglas IR# 8 Lot# 30 and 31 Development
Douglas IR#8 (08013) -
New Dock Installation - 317 Sasamat Lane
New Dock Installation - 317 Sasamat Lane -
Xa'xtsa (Douglas First Nation) Wastewater and Sludge Management
Douglas IR#8 (08013) -
Timber harvesting on MOUNT CURRIE 6
Mount Currie 6 -
Skatin-Wastewater System and Sludge Management
Skatin First Nation, 08015 - SKOOKUMCHUCK 4 -
Timber harvesting on MOUNT CURRIE 6 & MOUNT CURRIE 7
Mount Currie 6 -
Timber harvesting on Skookumchuck 4
Skoomkumchuk 4, 4A and 9 -
Maintenance Dredging - Lhoist North America of Canada Inc.
Maintenance Dredging - Lhoist North America of Canada Inc. -
Lílwat Nation: Xetólacw Village Road Resurfacing
Xetólacw Village where works are planned to occur is located roughly 5 km east of Mount Currie Village on IR #6. -
Lower Similkameen Indian Band - Deflection Berms Project
Lower Similkameen Indian Band - Deflection Berms Project -
Shxw'owhámél First Nation Outdoor Recreation Infrastructure Project
Shxw'owhámél First Nation -
Septic Tank Replacement at Edgewood BC Post Office
211 Lakeshore Ave, Edgewood, BC, V0G1J0 -
Samahquam-Wastewater System and Sludge Management
Samahquam First Nation, 08041 - Q'ALATKU7EM -
Timber harvesting on MOUNT CURRIE 6 & MOUNT CURRIE 7
Mount Currie 7 -
Orchard/Vineyard Lease - Lot 42, Similkameen IR#2
Lot 42, Similkameen IR#2 -
Timber Harvesting on Pete Suckers IR 13
Pete Suckers IR 13 -
Timber harvesting on MOUNT CURRIE 6
Mount Currie 6 -
(Lil'wat IR# 10) Poleyard Dike Improvements along Birkenhead River
Lil'wat IR#10 -
Peters First Nation Phase 3 Erosion Mitigation
Peters First Nation -
Esk'Etemc First Nation Road and Drainage Improvements (Alkali Lake)
Alkali Lake 1; Swan Lake 3; and Alkali Lake 4A -
Peters Island Flood and Erosion Mitigation
Peters First Nation - Peters 2 -
Peters First Nation - Fraser River Flood Control Berm
Peters First Nation, British Columbia -
Peters First Nation Gravel Pit Activation
Peters IR 1 -
Lower Similkameen Indian Band - Flood Mitigation Project
Chopaka 7 & 8 Indian Reserve -
Osoyoos Indian Band - Rendezvous Beach Resort
Osoyoos Indian Band - Rendezvous Beach Resort -
Proposed Vineyard at Osoyoos IR1
Osoyoos IR1 -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Nazco 20 -
New Telus Communications Inc. Telecommunication Tower Project in Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands
Alkali Lake I.R. No. 1 on Esk'etemc Nation Lands -
Esk'etemc First Nation - Telus Telecommunications Tower - Alkali Lake
Esk'etemc First Nation -
Sunrise Expansion Program
Reserve - Seabird Island Band -
Esk'etemc-Alkali Lake IR1 Wastewater Upgrades project
Esk'etemc, Alkali Lake IR 1 -
Debris Deflector Installation
Debris Deflector Installation -
Seabird Island Indian Band - Seabird Island Community and Cultural Centre
Seabird Island Indian Band - Seabird Island Community and Cultural Centre -
Osoyoos Indian Band - Wolf Creek Affordable Housing Project
Osoyoos Indian Band - Wolf Creek Affordable Housing Project -
Annacis Water Main No. 2 Scour Protection project
Annacis Water Main No. 2 Scour Protection project -
Seabird Island Cultural Education, Community Resource Centre and Long-House Project
Agassiz, British Columbia -
Sunrise Expansion Program
Reserve - Cheam First Nation -
Electric Vehicle Charging Station Installation at Osoyoos Border Crossing
Osoyoos Border Crossing -
New Fibre Installation
Project Site 09: PopKum 1 -
Sts'ailes Nation Subdivision Infrastructure Project
Chehalis IR5, near Mission, BC -
Sts'ailes Nation Wastewater System Upgrade Project
Chehalis IR5, near Mission, BC -
Sts'ailes Nation Water System Upgrade Project
Chehalis IR5, near Mission, BC -
Vito Shipyards Wharf Repairs - Extension to the Expiry Date - Public comments invited
Vito Shipyards Wharf Repairs - Extension to the Expiry Date -
Kwìkwèxwelhp Healing Village - Access Road Repair and Re-grading
Kwìkwèxwelhp Healing Village -
Site preparation for a subdivision on Popkum IR 2
Popkum IR2